Friday, April 15, 2011

4 More Days


-Edit-
Total shots: 78 73 67
Shots done: 54 55 58
Shots left: 24 18 16 9
days left: 4 3 2 1
Having a fully animated film:

Monday, April 4, 2011

End of March Work Reel

Right now my film is at 65 shots total.
I have 34 animated and 31 to go.

I plan on having everything animated and timed out by the end of next week.



Thursday, March 17, 2011

She Can Talk

Spring Break is over and it was a wasted week as far as getting things done on my film, but as far as job hunting goes it was extremely successful.


So this week I have been working on some more dialogue tests for Ashley.  I finally found a way that works and I am happy with how it looks now.





My goal for the next few weeks is to finish animating.  I want to have all 77 shots (give or take a few I keep adding and cutting) done by April 2nd.  As of right now I have 18 done. 
A long way to go but it will get done.

Tuesday, October 12, 2010

production Schedule

Here is a rough timeline of what I have to get done and when it needs to get done. Things will probably be changed around a bit depending how long it takes me to build my sets and puppets but its a good start to keeping me organized.


semester 1
week 1
script, storyboard, animatic
week  2
revise story, redo animatic
week 3
more story changes, puppet armatures, artist statement and bio
week 4
finalize all animatic and story changes, model, character building
week 5
start practice sets, start foam mountain
week 6
finish foam mountain, finish practice mt. resume and cover letter due
week 7 midterms
thesis presentation, midterm critique, schedule, artist statement, bio, resume, cover letter, blog. concept art, research
week 8
finish building all armatures, put padding and start clothes
week 9
build structures for slopes, cont. puppets
week 10
check up, dreamland characters, cont. sets (plaster layers)
week 11
finish main puppets, cont. sets, paint cars
week 12
critique, demo reel due, cont. dreamland characters, sets
week 13
sets
week 14
props, practice green screen compositing and layers, finish what needs to be finished
week 15 finals
demo reel, blog, updated documents
winter break
finish anything that need to be done before animating